Aerial view of Newhurst Energy Recovery Facility

Sustainability Report 2025

Our latest Sustainability Report tracks the positive impact of our Energy-from-Waste operations in 2025 against the ‘triple bottom line’ framework of People, Planet and Performance.

Our essential role in the treatment of society’s residual waste, the delivery of secure baseload electricity and the recovery of materials for reuse comes with important responsibilities and we are proud to continue our exemplary record in fulfilling our role safely and efficiently.

Highlights include our breakthrough progress on construction of the UK sector’s first full-scale carbon capture plant, the strengthening of our core operational cluster in the UK Midlands, the first full year of operations at our ash-to-aggregates processing facility and the recruitment of our first ever UK-based apprentices.

We are proud of our achievements and hope you enjoy reading more about our ongoing work to provide both a vital societal role and a key delivery vehicle for green infrastructure and clean energy.

Our sustainability performance

The data tables below provide details of our latest performance against a series of key sustainability measures, as highlighted within our 2025 Sustainability Report.

These measures are presented within the ‘triple bottom line’ framework of People, Planet and Performance. They are monitored and reported to our Sustainability Committee on a quarterly basis to help accelerate our progress in delivering ‘more than energy from waste’.

People

  Safety 20242025
Total number of person hours worked629,760607,748
Fatality00
Reportable incidents11
Lost time injury (non-RIDDOR
& also ROI reportable >3 days >7days)
01
Minor injury / first aid3139
Incidents, near misses (non-injury), Process Safety, Security, Complaints226208
Hazard observations16351742

 

  Apprentices recruited20242025
Newhurst ERF02
Rookery South ERF02
Protos ERF04

 

  Community Funding20242025
Rookery South Community Trust Fund£370,000£450,000

Planet

  Combined Encyclis GHG emissions
(Dublin, Newhurst, Rookery South and Corporate London HQ*)
Year20242025
Emissions themeGHG Emissions (tCO2e)
Percentage split by Scope (%)GHG Emissions (tCO2e)
Percentage split by Scope (%)
Scope 1762,15994.5%744,93493.2%
Scope 28<0.1%9<0.1%
Scope 344,6765.5%54,5206.8%
Overall emissions806,843100%799,463100%
* Emissions from London HQ are negligible compared with our operational sites – Scope 2: 8.9 tCO2e; Scope 3: 371.76 tCO2e; Total: 380.66 tCO2e

 

  GHG Emissions by facility
FacilityDublinNewhurst
Rookery South
Year202420252024202520242025
Emissions themeGHG Emissions (tCO2e)
Scope 1293,511288,768178,607178,709290,040277,457
Scope 2000000
Scope 314,53020,0806,7598,50923,18725,558
Overall emissions308,042308,848185,366187,219313,227303,015

 

  Water usage2024 (m3) 2025 (m3)Change
Dublin WtE239,481 236,044-1.43%
Rookery South ERF71,24074,789+4.98%
Newhurst ERF36,92730,640-17.02%
Total347,648341,473-1.77%
Notes: Our Dublin facility is responsible for a large proportion of our total water use. This is due to the use of a site-specific flue gas treatment that includes a scrubber, in line with the operational requirements of the facility.

 

  % of IBA recycled in the UK 2024 2025
Newhurst ERF100%100%
Rookery South ERF100%100%
Total tonnes of IBA treating at our dedicated processing facility
Wellingborough IBA facility 112,552 tonnes183,000 tonnes

 

  Tonnes of ACPr recycled  2025
All UK facilities9,000 tonnes

Performance

  Residual waste treated (tonnes) 2025
Rookery South ERF581,788
Newhurst ERF356,188
Dublin WtE526,897
Total1,464,873

 

  Power exported (MWh) 2025
Rookery South ERF484,228
Newhurst ERF226,716
Dublin WtE447,290
Total1,158,234
Earls Gate excluded from this table as it is not operated by Encyclis

  Emissions parameters: All sites combined Sampling% Compliance with ELV (daily limit)
ParticulatesContinuous100%
Oxides of nitrogenContinuous99.9%
Sulphur dioxideContinuous100%
Carbon monoxideContinuous100%
Total Organic CarbonContinuous100%
Hydrogen chlorideContinuous100%
Hydrogen fluorideContinuous100%
Nitrous oxideContinuous100%
AmmoniaContinuous100%
% Compliance with ELV
Hydrogen fluoride (HF)Periodic (twice a year)100%
Cadmium (Cd) and Thalium (Tl)Periodic (twice a year)100%
Mercury (Hg)Periodic (twice a year)100%
Heavy MetalsPeriodic (twice a year)100%
Dioxins and FuransPeriodic (twice a year)100%
PCBsPeriodic (twice a year)100%

 

  All site emissions as a % of the Emission Limit Value (ELV) in 2025
Particulates7.5%
Oxides of nitrogen79.78%
Sulphur dioxide12.72%
Carbon monoxide16.6%
Organic Carbon3.1%
Hydrogen chloride41.71%
Ammonia1.54%

 

  Triple ISO certification for UK facilities 2024 (%)2025 (%)
Newhurst ERFIn placeIn place
Rookery South ERFIn placeIn place
Covers ISO 9001: 2015 for Quality Management; ISO 14001: 2015 for Environmental Management; and ISO 45001: 2018 for Occupational Health and Safety Management.